Scope:
- Installation of 150mm Trimo wall panels with Prisma finish, forming distinctive tangerine-coloured elevations
- Primary roofing system including parapet upstands, gutters, and 2mm PPC aluminium cappings to complete envelope detailing
- Rainwater system comprising 5x 150mm PPC aluminium rainwater pipes to main roof and 1x 100mm pipe to loading canopies
- Construction of low-level loading canopies and lift shaft over-run cladding
- Integration of a roof access hatch and associated bespoke metalwork fabrications
- Complex logistics including craneage operations for rear elevation and back gable panel installation
Principal Contractor: Mitchell Design & Construction
End User: Lok’nStore
Division: Roofing & Cladding
Completion: March 2025
Value: £693,930.91