Skip Navigation

Cleanroom suite

Devon

Scope:

  • Environmental Envelope: Precision installation of 948m2 of 100mm PIR core wall panels and 878m2 of mineral wool suspended ceiling systems.

  • Specialised Finishes: All surfaces feature a white food-safe laminate finish to meet stringent hygiene and sterility standards.

  • Advanced Access Solutions: Integration of 3 high-speed rapid-rise doors (3000mm x 3000mm) and 6 cleanroom-grade personnel doors equipped with vision panels.

  • Operational Flexibility: Installation of a 4.4m x 4m demountable wall section designed for large-scale equipment transit and facility adaptability.

  • Structural Integration: Design and implementation of secondary steel support frameworks for ceiling suspension and door apertures.

 

Principal Contractor: Bassaire Cleanrooms

Division: Temperature Controlled

Completion: July 2023

Value: £295,567.13