Scope:
- Delivery of a full external roofing and cladding package for a new-build waste management facility
- Roofing system using Tata Trisomet 333 insulated panels (120mm) to both main buildings, with tailored internal lining to suit operational requirements
- Wall envelope formed using 100mm Tata Trisomet 333 insulated panels across all elevations
- Integrated rainwater system including membrane-lined trimline gutters, PPC aluminium rainwater pipes, and associated fabrications
- External and internal detailing package including steel flashings and white liner flashings to corners, openings, and junctions for durability and finish
- Roof access provision and coordination of high-level installation works using specialist lifting plant and craneage operations
Principal Contractor: Morgan Sindall
Division: Roofing & Cladding
Completion: August 2025
Value: £1.2 mil